Beyond the Jetway: A Complete Operator's Guide to Realistic Gate Turnaround Procedures
Parking at the gate is only the beginning. The interval between block-in and pushback clearance is one of the most operationally complex periods in commercial aviation — and one of the most underutilized opportunities for immersion in flight simulation. This guide walks through every phase of a realistic turnaround, from ground crew coordination and fuel sequencing to de-ice logistics and departure readiness.